Renewable Energy project

Crow Lake Wind Farm Construction - 162MW

White Lake, South Dakota | Basin Electric Power Cooperative

Scope Of Work: Wind Farm Contractor Services
 
Basin Electric Power Cooperative contracted MasTec to construct the Crow Lake Wind Farm, located outside White Lake, South Dakota. Construction of the 162MW wind farm began in October, 2010.  MasTec construction crews worked year round and finished the project in the middle of an arctic-cold winter, early in 2011.  The 108 GE wind turbines at the Crow Lake Wind Farm, recognized as the largest wind project owned solely by a cooperative, became fully operational in February, 2011.
 
Services Employed
 
  • Wind Farm Construction
  • Sitework                 
  • Roads
  • Foundations
  • Substation
  • Underground Electric Power Collection
  • Wind Turbine Erection