Project Description

Project included a 2 million gallon prestressed concrete finished water ground storage tank with a new 11,000 gallon per minute (gpm) capacity high service pump station consisting of five vertical turbine pumps with variable frequency drives (VFD), and an emergency power generator. The system was brought on-line in June 2008.
 

Scope of Work

Prestressed wire construction of 2.0 million gallon (MG) finished water storage tank and all associated yard piping, structural, electrical, instrumental and controls improvements at the City of Dania Beach Water Treatment Plant, including installation of new 30", 24" and 16" finish water ductile iron pipe underground services and process piping for high service pump station, construction of new VFD and electrical control buildings, and complete site development.