Government project

Fort Riley

Fort Riley, KS | Siemens Communications

Department of the Army

Designed and installed a large OSP fiber cable upgrade at Fort Riley.

Scope of Work

Designed and installed a 192 strand direct-buried fiber loop of more than 130,000 feet around large firing range areas. By terminating the fiber in both directions around the loop, our innovative design saved the Army the expense of a second fiber cable. We also installed concrete-encased duct bank in the main post area with non-zero dispersion shifted fiber cable. A significant challenge on this project was the large amount of rock. MasTec utilized our fleet of heavy equipment to implement this project on schedule.

Services Employed

  • Design and engineering, and installation
  • Heavy Equipment
  • Project Management
  • Testing