Electric Power project

New Madrid – Kennett 69 KV Electric Power Line Rebuild Phase 1 and 2

New Madrid, MO | Southwestern Power Administration (SWPA), Department of Energy

Department of Energy

SWPA needed to rebuild their key transmission infrastructure that was critically damaged by ice storms the previous year. 3 Phase Line rebuilt and rewired over 85 miles of electric power lines and OPGW.

Services Employed

  • Electric Transmission line construction and maintenance up to 500kv
  • Environmental Control Protection and Mitigation
  • Right-of-way restoration