Water / Sewer / Civil project

Sombrero Beach Road Wastewater Project

Marathon, Florida, Florida | City of Marathon

Installation of approximately 9,500 LF of SDR 21 vacuum main, including vacuum pits, branch connections, laterals, clean outs and associated fittings and valves, 9,025 LF of SCH 80 PVC reuse water main,3,980 LF of SDR 21 sewage transmission main, and approximately 3,300 LF of 18” HDPE.
 
Construction work and conditions typical of South Florida, and the Florida Keys, included:
 
• Coral Rock Excavation
• Vacuum Sewer Systems
• Environmentally Sensitive Coastal Areas
• High Groundwater Table
• High Density Neighborhoods
• Limited Construction Access