Gas / Oil project

Streator to Manhattan Oil Pipeline

Joliet, IL | Enbridge Energy

Scope of Work: Oil Pipeline Construction

Enbridge Energy employed MasTec construction services for the Streator to Manhattan Oil Pipeline Project. The oil pipeline project included construction and installation of 46 miles of 20" oil pipeline with approximately 11,000' of 20" horizontal directional drills, numerous wetland crossings and the installation of mainline valves.

Services Employed

  • Mainline Oil Pipeline Construction
  • Horizontal Directional Drilling
  • Wetland Crossing
  • Mainline Valve Installation