West Doe, Natural Gas Power Plant Phase III

Dawson Creek, British Columbia | Spectra Energy Transmission

Scope of Work
 
Spectra Energy Transmission engaged MasTec to construct the sour gas plant expansion with design flow rate of 45MMscfd, consisting of a horizontal inlet separator, amine plant, refrigeration plant, condensate stabilizer, acid gas compressor, VRU and recycle compressor.  Includes all storage tanks and waste disposal systems with all required piping and racking.  The project was completed in November 2009.