Kearl Oil Sands - Heavy Civil Construction
Pilings & Foundations | Kearl Lake, AB
Scope of Work
Installation of pilings and foundations for Imperial Oil’s Kearl Lake Oil Sands project. Approximately 11,000 cubic meters of concrete; 1,300,000 kg of steel reinforcing bars; 237 30” diameter driven pipe piles up to 110 ft depth; 2,02024” diameter driven steel pipe piles up to 110 ft depth; 1000m of HDPE pipe installed.
Services Employed
- Pilings
- Foundations
Related Projects
Natural Gas Pipeline Projects
Pipeline Construction
New York and Pennsylvania
Nacogdoches, Texas Natural Gas Pipeline
Pipeline Construction in Texas
Nacogdoches, Texas