Mohican-Battenkill Article VII Project
Transmission Construction | Moreau, NY
Scope of Work
This project consisted of reconstructing and reconductoring approximately 14.2 miles of two existing 115kV electric transmission lines in Saratoga and Washington Counties. The two lines are the Mohican-Battenkill Line 15 and a portion of the Mohican-Luther Forest Line 3, formerly known as Mohican-North Troy Line 3. The Project originated at the Mohican Substation in Moreau, NY, and ends at the Battenkill Substation in Easton, NY.
Services Employed
- 131 new steel structures
- 134 drilled pier foundations
- 5 vibratory caisson foundations
- 4 H-pile foundations
- 35,000’ of gravel roads
- 40,000’ of matted roads
- 28 circuit miles of conductor and shield wire replacement
Related Projects
Bingham Wind Power Project
Transmission and Distribution Construction
Bingham, ME
115kv Steel Structure Reinforce & Reconductor High Voltage Electric Transmission Line
Transmission Systems
MA, NH
Mona to Oquirrh Transmission Line (Pacificorp)
High Voltage Transmission Line
Salt Lake City, Utah