Ross Transloading
Civil Construction | Ross, ND
Scope of Work
Wanzek self-performed the civil, concrete, structural steel, equipment setting, process piping, instrumentation and commissioning for this truck-to-rail load out facility near Ross, ND. Wanzek also subcontracted and supervised the installation of the helical piles and performed work on the facility’s electrical and control system. The facility includes six truck unloading skids with the capability to load twelve rail cars at one time.
Services Employed
- Civil
- Concrete
- Electrical Instrumentation Mechanical
- Structural Steel Process Piping
Related Projects
Natural Gas Pipeline Projects
Pipeline Construction
New York and Pennsylvania
Nacogdoches, Texas Natural Gas Pipeline
Pipeline Construction in Texas
Nacogdoches, Texas