Expertise Service

MasTec's expert broadband design, installation and maintenance capabilities enable our customers to provide reliable cable and high-speed Internet service to millions of satisfied consumers across the nation.

17,000' of 8" steel natural gas pipeline in Texas, 14,000' of 12" steel pipeline, 20,104' of 16" steel natural gas pipeline, 247,366' of 24" steel pipeline, completed in 2010.

An energy company awarded MasTec a blanket contract for the installation of approximately 26 miles of 8"-20" natural gas pipeline. Construction services included numerous river, road and wetland crossing by horizontal directional drilling and dry crossing methods along with the installation of 6" Flex Steel water lines.

The Westgate Lake Manor subdivision consists of 162 homes serviced by on-site treatment units (septic tanks). The installation of a public sewer system eliminated a large source of pollution affecting their ground and lake water and resulted in much cleaner and safer environment. The installation of a new water main system also provided higher flow for both consumption and fire protection.

South Florida Water Management District and GlobeTec operate and maintain approximately 1,800 miles of canals and levees, 25 major pumping stations and about 200 larger and 2,000 smaller water control structures. After the storms of '04 and '05 ravaged the South Florida canal system, many of these canals were stressed beyond their limits and rehabilitation became critical.

This City of Tamarac project consists of the construction of finished water storage and high-service pumping improvements at the existing City of Tamarac Water Treatment Plant, located at 7803 NW 61st Street,Tamarac, Florida.

Displaying: 15 - 28 of 365