Expertise Service
We work on an individual or system-wide basis that includes equipment inspection, repair and replacement, facility upkeep and emergency restoration.
We work on an individual or system-wide basis that includes equipment inspection, repair and replacement, facility upkeep and emergency restoration.
We construct, expand, restore and maintain every aspect of electricity distribution.
We help our clients engineer and construct wind farms that meet both short- and long-term power demands.
We provide cell tower construction, cell tower site acquisition and cell tower maintenance services for some of the nation's largest cellular, broadband and digital-data providers.
Our work continues to support the world's most advanced fiber optic and copper networks in the country.
Electricity is generated and delivered in the most efficient manner, reducing the need for additional infrastructure and minimizing outage impacts to customers.
Our crews are able to give new life to existing roadways from widening and restoration, to transforming a downtown thoroughfare with sidewalks, tree planters, streetscapes and more.
MasTec has the experience, equipment, crews and resources necessary to engineer-procure-construct efficient and environmentally responsible gas-fired...
From gravity sewer lines, to large 84 inch force mains, MasTec's pipeline expertise allows us to transport wastewater with the highest levels of...
We self-perform design build projects, T&M services and lump-sum bids for industrial, and edible food plant construction, plant shutdown services and structural steel erection projects.
Furnish all materials, labor, tools and equipment required to repair nearly 4 linear miles (20,300 LF) of the C-24 canal banks.
South Florida Water Management District and GlobeTec operate and maintain approximately 1,800 miles of canals and levees, 25 major pumping stations and about 200 larger and 2,000 smaller water control structures. After the storms of '04 and '05 ravaged the South Florida canal system, many of these canals were stressed beyond their limits and rehabilitation became critical.
Replacement of existing WTP filtration media, filter surface wash agitator systems and filter under drains.
Northern Natural Gas has awarded MasTec the installation of 56 miles of 36", 30" and 24" natural gas pipeline.
Displaying: 29 - 42 of 472