This City of Tamarac project consists of the construction of finished water storage and high-service pumping improvements at the existing City of Tamarac Water Treatment Plant, located at 7803 NW 61st Street,Tamarac, Florida.

The Westgate Lake Manor subdivision consists of 162 homes serviced by on-site treatment units (septic tanks). The installation of a public sewer system eliminated a large source of pollution affecting their ground and lake water and resulted in much cleaner and safer environment. The installation of a new water main system also provided higher flow for both consumption and fire protection.

Renewable energy system spanning 11,000 acres of G-1 grazing land, this project consists of 57 Vestas 2.1 MW turbines, a 167,000 linear foot collection system, 7 miles of transmission line, a 161 kV substation and a 7,200 square foot O&M building.

Wanzek was the EPC contractor for the 45 megawatt General Electric LM6000 combustion turbine generator peaking unit for the Pioneer Generation Station located near Williston, ND.

Displaying: 57 - 70 of 472